CLASSROOM RENOVATION PROJECTS
2005-06

Projects Completed 2005–06
387 101
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
387 103
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
Broida 1610
Replace Computer Lectern Monitor
• Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
Buchanan 1910
Replace Classroom Data Projector
 
Campbell Hall
 
 
Chemistry 1171
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
Chemistry 1179
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
Engineering I, 1104
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
Girvetz 1119
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
Girvetz 2108
Add Data Projector
Add Computer Lectern with VCR, DVD, and control electronics
Add Network
Add Sound System
Replace Overhead Projector
Replace Screens (2)
 
Girvetz 2112
Add Data Projector
Add Computer Lectern with VCR, DVD, and control electronics
Add Network
Add Sound System
Replace Overhead Projector
Replace Screens (2)
 
Girvetz 2115
Add Data Projector
Add Computer Lectern with VCR, DVD, and control electronics
Add Network
Add Sound System
Replace Overhead Projector
Replace Screens (2)
 
Girvetz 2128
Coor floor for AC and Signal Cables for Computer Lectern
 
HSSB 1173
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
HSSB 1174
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
HSSB 1206
Add Data Projector
Add Sound System
Add AC and signal conduit for Data Projector
 
HSSB 1207
Add Data Projector
Add Sound System
Add AC and signal conduit for Data Projector
 
HSSB 1210
Add Data Projector
Add Sound System
Add AC and signal conduit for Data Projector
 
North Hall 1006
• Replace Screen surface
 
North Hall 1111
Remove TV’s
• Install Sound System
 
Psychology 1824
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
South Hall 1430
• Install new Data Projector
 
South Hall 1431
Replace Computer Lectern Monitor
Install USB Port on Lectern for Flash Drives, etc.
Repair Lectern hardware and cabling as needed
 
 
Projects to be Completed by 2005–06
387 101
 
 
 
 
387 103
Broida 1610
 
 
 
Buchanan 1910
 
 
Campbell Hall
Replace Classroom Data Projector
 
Chemistry 1171
 
 
 
Chemistry 1179
 
 
 
 
Engineering I, 1104
 
Girvetz 1119
 
 
Girvetz 2108
 
 
 
 
 
 
Girvetz 2112
 
 
 
 
 
 
 
Girvetz 2115
 
 
 
 
 
 
 
Girvetz 2128
Add Network
 
HSSB 1173
 
 
 
 
HSSB 1174
 
 
 
 
HSSB 1206
 
 
 
 
HSSB 1207
 
 
 
HSSB 1210
 
 
 
 
North Hall 1006
 
 
North Hall 1111
 
 
 
Psychology 1824
 
 
 
 
South Hall 1430
 
 
South Hall 1431
 
 
 
 
 