GENERAL
1. Replace chalkboards campuswide (FM)
2. Expand Classroom Data Network (IR)
3. Install 14 new VCR wallboxes (IR)
4. Install slide projector shelves (IR)
5. Install slide projectors and cabinets (IR)
6. Install 20 new projection screens (IR / FM)
7. Replace older media equipment inventory (IR)
8. Install 13 new data / video projectors (IR)
1. Arts 1245, 1247, 1251
A. Install new slide projector(s). (IR)
2. Broida 1610 and 1640
A. Install 2 new slide projectors in each room. (IR)
B. Install classroom data network port. (IR)3. Broida 1015 and 1019
A. Install classroom data network port. (IR)
4. Biology III 1217
A. Paint (FM)
B. Install new slide projector (IR)5. Chemistry 1171
A. Add classroom data network port (IR)
B. Add data / video projector (IR)
C. Add VCR wallbox (IR)
D. Install new slide projector (IR)6. Chemistry 1179
A. Replace carpeting / remove asbestos tile (FM)
B. Add classroom data network port (IR)
C. Add VCR wallbox (IR)
D. Install 2 new slide projectors (IR)7. Engineering 1104
A. Add classroom data network port (IR)
B. Add data / video projector (IR)
C. Add dual slide projectors and screens (IR)
D. Install sound system (IR)
E. Replace ceiling and lighting (IR)
F. Add VCR wallbox (IR)
G. Install new slide projector (IR)8. Girvetz 1108, 1110, 2110
A. Replace carpeting with tile flooring (FM)
9. Girvetz 2108, 2110, 2112, 2115, 2119, 2120, 2124, 2127, 2128, 2129, 2135
A. Install new projection screen. (IR)
10. Girvetz 2108, 2110, 2112, 2115, 2116, 2119, 2120, 2123, 2124, 2127, 2128, 2129, 2135
A. Install projector shelf. (IR)
11. Isla Vista Theaters
A. Paint (FM)
B. Lead abatement (FM)
C. Add drainage system in both theaters (FM)
D. Replace seating (FM)
E. Replace carpeting (FM)
F. Upgrade sound system in Theater 1 (IR)12. Modular Classroom Building 387 Rooms 101, 103, and 104
A. Construct new modular building (FM)
B. Install classroom data network port. (IR)
C. Install 2-way video link to Kerr Hall (IR)
D. Install dual slide projectors and screens. (IR)
E. Install VCR wallbox. (IR)
F. Install sound system. (IR)
G. Install data / video projector. (IR)13. North Hall 1006
A. Paint (FM)
B. Replace fixed seating (FM)
C. Asbestos tile removal / replacement (FM)
D. Add classroom data network port (IR)
E. Add VCR wallbox (IR)
F. Add data projector (IR)14. North Hall 1105
A. Replace flooring (FM)
B. Paint (FM)
C. Install data / video projector (IR)
D. Install dual slide projectors and screens (IR)
E. Install VCR wallbox (IR)
F. Add classroom data network port (IR)15. North Hall 1109
A. Replace flooring (FM)
B. Paint (FM)
C. Install TV monitors (IR)
D. Install dual slide projector shelves and screens (IR)
E. Install VCR wallbox (IR)
F. Add classroom data network port (IR)16. North Hall 1111
A. Replace flooring (FM)
B. Paint (FM)
C. Install TV monitors (IR)
D. Install slide projector shelf and screen (IR)
E. Install VCR wallbox (IR)
F. Add classroom data network port (IR)17. Phelps 1160
A. Paint (FM)
B. Asbestos abatement / replace floor tile (FM)
C. Replace fixed seating (FM)
D. Replace chalkboard (FM)
E. Replace ceiling and lights (FM)
F. Add classroom data network port (IR)
G. Add data / video projector (IR)
H. Install 2 new slide projectors (IR)
I. Install 2 new screens (IR)18. Phelps 1260
A. Replace flooring / asbestos abatement (FM)
B. Paint (FM)
C. Replace fixed seating (FM)
D. Replace window blinds (FM)
E. Replace drop ceiling and lighting (FM)
F. Add data / video projector (IR)
G. Replace screen (IR)
H. Add classroom data network port (IR)
I. Install new slide projector (IR)19. Phelps 1420, 1444, 1445, 1448, 1508, 3515, 3519, 3523
A. Install new projection screen. (IR)
B. Install projector shelf. (IR)20. Phelps 1425, 1440
A. Paint (FM)
B. Replace blinds (FM)
C. Add classroom data network port (IR)21. Psychology 1802
A. Add classroom data network port (IR)
B. Install new projection screen (IR)
C. Install new slide projector (IR)22. Psychology 1824
A. Add classroom data network port (IR)
B. Add data / video projector (IR)
C. Install new projection screen (IR)
D. Install new slide projector (IR)23. South Hall 1430 and 1431
A. Paint (FM)
B. Replace seating (FM)
C. New chalkboards (FM)
D. Add classroom data network port (IR)
E. Add data / video projector (IR)
F. Add dual slide projector shelves and screens (IR)
G. Install sound system (IR)
H. Add VCR wallbox (IR)
I. Add 2-way closed circuit video link to Kerr Hall (IR)24. South Hall 1609
A. Paint (FM)
B. Add classroom data network port. (IR)
C. Add VCR wallbox and TV monitor. (IR)
D. Add 2-way closed circuit video link to Kerr Hall. (IR)
E. Add single slide projector and screen. (IR)25. Webb 1100
A. Add note taking lights and improve lighting controls. (FM)
B. Install 2 new manual 8 ft. screens in new soffit. (FM)
C. Resurface old motorized screen. (FM/IR)
D. Build new soffit to hide manual screens and maps and provide an area to mount a pair of speakers. (FM)
E. Install VCR wallbox. Wallbox to include classroom data network port, Geology network port, data projector RGB input, intercom, and slide projector control jacks. Bottom of VCR wallbox to be extended in order to accomodate slide projector remote control storage. (IR)
F. Create an area in the ceiling behind the manual screens to suspend 4 pull down maps - 2 behind each screen. (FM)
G. Install new chalkboards with same square footage as existing boards. (FM)
H. Purchase new lectern. (IR)
I. Rebuild demonstration table. Resurface sides and front in natural oak to match existing wood trim in room.Remove old DC electrical from cabinet. Remove all boxes and outlets from the front of the cabinet. Move AC outlets to rear of cabinet. Install lighting controls on both sides of cabinet for ease of use. (FM)
J. Install data / video projector. (IR)
K. Modify board lighting system. Ideally, board lights should be independently controlled allowing faculty to use any combination of screens and boards. Board light should not illuminate screens. Add downlight at lectern (7) would be ideal for instructors using computers and data projector. (FM)
L. Install projector cabinet flush with rear wall in center of room. Cabinet to house 2 projectors side-by-side on slide-out shelves. Sliding glass door fronts should be integrated into the cabinet to minimize projector noise. (FM)
M. Replace seating. (FM)
N. Paint entire room. (FM)
O. Replace floor tile and asbestos abatement. Replace rubber mats with carpeting in aisles. (FM)
P. Remove demonstration track. (FM)
Q. Remove old TV monitors, AC, cabling, and raceways. (FM)
R. Remove TV intercom box and existing surface mount wiremold boxes and conduits. Move Geology network port to TV wallbox. (FM)
INSTRUCTIONAL DEVELOPMENT | INSTRUCTIONAL RESOURCES | UCSB
Refreshed August 2001
Art Battson